definitivo2023frontpaolo-recuperato
definitivo2023frontpaolo-recuperato

01architetti Architetti  |   Mail. 01architettil@gmail.com

Piazza Brignole 3/9 Genova (GE)   |   Tel. 0108684978   |   Cell. 3469508077 


facebook
instagram
whatsapp
messenger

© 2024 - 01architetti Architettura & Design

Project of the colour Crocefieschi

formatoorizzontale


Location: Crocefieschi (GE)

Client: ​Municipality of Crocefieschi (GE)

Job: Project of the Colour according to Region Law Liguria October 27, 2003 No. 26 "City at Colour"

Date: 2004-2006 (design)

Amount: /

Project: Architects A. Costanzo, M. Gamba, L. Piccardo,

G. Montaldo

Collaborators: Architects C. Cassinelli, A. Imbesi, E. Pera, L. Ruwet - A. Barbieri

Contractor: /

Category (table z-1): E-20

016_foto-storica_palazzo-fieschi-2_1612444431209016_a1_viamazzini-a-lato-1016_a1_viamazzini-a-lato-2016_a1_viamazzini-p-lato1016_a2_viaxxsettembre-a016_a1_viamazzini-p-lato2016_a2_viaxxsettembre-p016_a3_piazzamartiri-a016_a4_piazzaallachiesa-a016_a3_piazzamartiri-p016_abaco-p016_ed043acx-a016_a4_piazzaallachiesa-p016_em-acx-a016_ed043acx-p016_em-acx-p016_scheda-2.1.1016_scheda-2.1.3016_scheda-2.1.2016_scheda-5.2.2b016_scheda-2.1.4016_scheda-5.2.2f016_scheda-5.5016_scheda-5.6016_scheda-6.3.1-area1

<<< Projects table

Description

The "Project of Colour" is a planning instrument that aims enhancement of colours, construction and environmental redevelopment of buildings and artifacts facing public spaces, as they represent a value for the community. It is the exact level of the discipline of landscape City Urban PlannEngineer


This paper has addressed the issue of recovery of painted facades taking as a fundamental value detection, defined as a process of comprehensive and multidisciplinary knowledge, done at different scales of built (territorial, urban, construction), in order to achieve critical mass knowledge that is the basis of documents which to draw for a direct intervention on built.

The logical path that has led to the design of each project has been divided into four phases:


- Development of the system of filing


- The importance of the built


- The diagnosis of built


-The project intervention